Kukës
A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.
🧭 引导视图
初次了解阿尔巴尼亚?每个页面均以通俗易懂的说明开篇——即便是十岁的孩子也能读懂——随后再展开详细内容。
⚡ 专业视图
您已掌握基础知识。直接进入正题,简明解释默认隐藏。此为默认模式。
Fierza is the biggest dam on the Drin river. Its reservoir reaches back towards Kosovo, and it flooded the old town of Kukës.
Fierza is the biggest dam on the Drin river. Its reservoir reaches back towards Kosovo, and it flooded the old town of Kukës.
The Fierza Hydroelectric Power Station (Albanian: Hidrocentrali i Fierzës) sits on the Drin River in northern Albania as the uppermost of three hydroelectric plants in the Drin cascade. The two downstream stations, Koman and Vau i Dejës, follow it in sequence along the river.
Fierza's position at the head of the cascade, combined with its installed capacity and the volume of its reservoir, gives it a controlling role in the operation of the entire system. The reservoir regulates annual inflows into the cascade, increasing the efficient use of all three plants. Fierza's annual output averages 1,330 GWh, which represents approximately 33 percent of total Drin cascade production.
Preparatory work for the plant began in 1970, with dam construction starting in 1971. The project was completed over a decade of activity, with the first generating unit becoming operational in 1978 and the station reaching full operation in 1980. The reservoir was filled with water between 1978 and 1981.
Approximately 14,000 workers, engineers, and specialists were involved in building the plant. Equipment was sourced mostly from China, though the design concepts were developed by Albanian engineers.
The dam at Fierza is a rock-fill structure with a clay core. It stands 167 metres (548 ft) high and measures 380 metres (1,250 ft) in length along its crest. The dam has a total volume of 8 million cubic metres.
At the time of its construction, the Fierza dam was the second highest dam of its type in Europe. It is one of three hydroelectric dams on the Drin River.
The plant contains four generating units, each equipped with a Francis vertical turbine rated at 125 MW. This gives the station a total installed capacity of 500 MW.
Each unit drives a three-phase synchronous generator operating at 13.8 kV. Step-up transformers raise the output voltage from 13.8 kV to 242 kV for connection to the transmission system substation.
With an average annual output of 1,330 GWh, Fierza accounts for roughly one third of the electricity produced by the full Drin cascade. This share reflects both the plant's own generating capacity and its influence over the flow of water available to the downstream stations at Koman and Vau i Dejës.
Beyond its direct generation, the large volume of the Fierza reservoir enables it to store and regulate the Drin's annual inflows. This regulatory function is considered central to the safe and efficient operation of the cascade as a whole.
Fierza is described as playing a key role in Albania's hydroelectric system by virtue of its installed power capacity, its location at the top of the cascade, and the volume of its reservoir. The plant was built with a combination of foreign equipment and domestic engineering expertise, reflecting the conditions of Albanian industrial development during the 1970s.
The Fierza reservoir also supports the Koman and Fierza Reservoirs Ferry service, which uses the lake formed by the dam as a transport route, though this function is separate from the plant's energy generation role.
三十年气候平均值,地点: Fierza Hydropower Plant, 由本 Atlas 依据 1994—2023 年 ERA5 逐日再分析数据计算得出。以上为长期平均值,并非预报;任何单一年份均可能存在较大偏差。
最热月份为 August (日最高气温均值 29°C), 最冷月份为 January (日最低气温均值 -0°C), 降水最多的月份为 December (229 mm). 年均降雨总量为 1,795 mm.
| 月份 | 最高气温 | 最低气温 | 降雨量 | 降雨天数 | 日照时长 |
|---|---|---|---|---|---|
| January | 6°C | -0°C | 193 mm | 13 | 6.4 h |
| February | 8°C | 1°C | 173 mm | 12 | 7.4 h |
| March | 11°C | 4°C | 167 mm | 14 | 9.0 h |
| April | 16°C | 8°C | 144 mm | 14 | 10.1 h |
| May | 22°C | 13°C | 126 mm | 15 | 11.7 h |
| June | 26°C | 17°C | 94 mm | 12 | 13.3 h |
| July | 28°C | 19°C | 84 mm | 10 | 13.5 h |
| August | 29°C | 20°C | 72 mm | 10 | 12.6 h |
| September | 24°C | 15°C | 142 mm | 11 | 10.3 h |
| October | 19°C | 11°C | 153 mm | 10 | 8.7 h |
| November | 13°C | 6°C | 218 mm | 13 | 6.6 h |
| December | 8°C | 2°C | 229 mm | 14 | 5.9 h |
数据来源: ERA5 reanalysis via Open-Meteo, 1994–2023 · "最高气温"与"最低气温"分别为日最高和日最低气温均值。"降雨天数"统计降水量不低于 1 毫米的天数。 获取 JSON 数据
以下均为本 Atlas 中真实存在的关联关系——与本地点邻近的地点,以及本条目实际所属的主题类别。本栏目不包含任何通用推荐内容。
A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.
A wide white riverbed under 2,500 m peaks; the eastern end of the Theth trek.
The middle station of the Drin cascade, and the dam that created Lake Koman.
A 34 km reservoir in a gorge so narrow the ferry crossing is treated as a scenic journey in its own right.
Albania's longest river and the backbone of its electricity system, dammed three times in the north.
The road head for the Valbona valley, named after a guerrilla leader of the 1920s.
Electricity almost entirely from hydropower — which makes supply depend on rainfall.
The state generator that runs the Drin cascade and supplies most Albanian electricity.
Albania's longest river and the backbone of its electricity system, dammed three times in the north.
上文标注"深度解析"的章节,系本 Atlas 依据以下来源文章全文阅读后撰写而成 (1,909 字符). 以上内容为基于该文献的 AI 辅助研究成果,并已与本页精选事实核对。如涉及重要事项,请务必核对原始来源。
本页内容有误? 欢迎提交更正意见,所有意见均会与原始记录核对。请告知错误所在,如能提供正确数据的出处,请一并注明。