Skip to content
The Albania Atlas A reference to a country
The Albania Atlas
Explore Map of Albania The 12 counties All places
Sections TravelLiving CultureHistory NatureBusiness Infrastructure
Tools DataLearn NewsAsk the Atlas Compare tool AI agents ★ SavedAPI
About About usMethodology Data sources Photo policy Editorial policy Corrections Contact
Settings
Dark mode
Interface language

🧭 Guided view
New to Albania? Every page opens with a plain-language explanation you could read to a ten-year-old, before the detail begins.

⚡ Expert view
You already know the basics. Straight to the substance, with the simple explanations hidden. This is the default.

★ Your saved pages

In plain language

Fierza is the biggest dam on the Drin river. Its reservoir reaches back towards Kosovo, and it flooded the old town of Kukës.

Simple explanation

Fierza is the biggest dam on the Drin river. Its reservoir reaches back towards Kosovo, and it flooded the old town of Kukës.

Position in the Drin River cascadeDeep dive

The Fierza Hydroelectric Power Station (Albanian: Hidrocentrali i Fierzës) sits on the Drin River in northern Albania as the uppermost of three hydroelectric plants in the Drin cascade. The two downstream stations, Koman and Vau i Dejës, follow it in sequence along the river.

Fierza's position at the head of the cascade, combined with its installed capacity and the volume of its reservoir, gives it a controlling role in the operation of the entire system. The reservoir regulates annual inflows into the cascade, increasing the efficient use of all three plants. Fierza's annual output averages 1,330 GWh, which represents approximately 33 percent of total Drin cascade production.

Construction history and workforceDeep dive

Preparatory work for the plant began in 1970, with dam construction starting in 1971. The project was completed over a decade of activity, with the first generating unit becoming operational in 1978 and the station reaching full operation in 1980. The reservoir was filled with water between 1978 and 1981.

Approximately 14,000 workers, engineers, and specialists were involved in building the plant. Equipment was sourced mostly from China, though the design concepts were developed by Albanian engineers.

Fierza Hydroelectric Power Station in Albania
Fierza Hydropower Plant — Fierza Hydroelectric Power Station in Albania You may re-use this image under the terms of the license using the following reference… · CC BY 3.0 · Wikimedia Commons

The rock-fill dam: dimensions and designDeep dive

The dam at Fierza is a rock-fill structure with a clay core. It stands 167 metres (548 ft) high and measures 380 metres (1,250 ft) in length along its crest. The dam has a total volume of 8 million cubic metres.

At the time of its construction, the Fierza dam was the second highest dam of its type in Europe. It is one of three hydroelectric dams on the Drin River.

Generating equipment and electrical specificationsDeep dive

The plant contains four generating units, each equipped with a Francis vertical turbine rated at 125 MW. This gives the station a total installed capacity of 500 MW.

Each unit drives a three-phase synchronous generator operating at 13.8 kV. Step-up transformers raise the output voltage from 13.8 kV to 242 kV for connection to the transmission system substation.

Role in energy production and cascade regulationDeep dive

With an average annual output of 1,330 GWh, Fierza accounts for roughly one third of the electricity produced by the full Drin cascade. This share reflects both the plant's own generating capacity and its influence over the flow of water available to the downstream stations at Koman and Vau i Dejës.

Beyond its direct generation, the large volume of the Fierza reservoir enables it to store and regulate the Drin's annual inflows. This regulatory function is considered central to the safe and efficient operation of the cascade as a whole.

Fierza in the context of Albanian energy infrastructureDeep dive

Fierza is described as playing a key role in Albania's hydroelectric system by virtue of its installed power capacity, its location at the top of the cascade, and the volume of its reservoir. The plant was built with a combination of foreign equipment and domestic engineering expertise, reflecting the conditions of Albanian industrial development during the 1970s.

The Fierza reservoir also supports the Koman and Fierza Reservoirs Ferry service, which uses the lake formed by the dam as a transport route, though this function is separate from the plant's energy generation role.

Climate by month

Thirty-year normals for Fierza Hydropower Plant, computed for this Atlas from daily ERA5 reanalysis over 1994–2023. These are long-run averages, not a forecast: any individual year can differ substantially.

The warmest month is August (mean daily high 29°C), the coldest is January (mean daily low -0°C), and the wettest is December (229 mm). Total annual rainfall averages 1,795 mm.

MonthHighLow RainWet daysSun/day
January 6°C -0°C 193 mm 13 6.4 h
February 8°C 1°C 173 mm 12 7.4 h
March 11°C 4°C 167 mm 14 9.0 h
April 16°C 8°C 144 mm 14 10.1 h
May 22°C 13°C 126 mm 15 11.7 h
June 26°C 17°C 94 mm 12 13.3 h
July 28°C 19°C 84 mm 10 13.5 h
August 29°C 20°C 72 mm 10 12.6 h
September 24°C 15°C 142 mm 11 10.3 h
October 19°C 11°C 153 mm 10 8.7 h
November 13°C 6°C 218 mm 13 6.6 h
December 8°C 2°C 229 mm 14 5.9 h

Source: ERA5 reanalysis via Open-Meteo, 1994–2023 · “High” and “Low” are mean daily maximum and minimum air temperature. “Wet days” counts days with at least 1 mm of precipitation. Get this as JSON

Connected subjects

These are real relationships in the Atlas — places that are near this one, and subjects it genuinely belongs with. Nothing here is a generic recommendation.

Nearby

Town

Kukës

A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.

KukësiKukes
Village

Valbonë

A wide white riverbed under 2,500 m peaks; the eastern end of the Theth trek.

ValbonaKukes
Energy site

Koman Hydropower Plant

The middle station of the Drin cascade, and the dam that created Lake Koman.

Shkoder
Lake

Lake Koman

A 34 km reservoir in a gorge so narrow the ferry crossing is treated as a scenic journey in its own right.

Shkoder
River

The Drin

Albania's longest river and the backbone of its electricity system, dammed three times in the north.

Shkoder
Town

Bajram Curri

The road head for the Valbona valley, named after a guerrilla leader of the 1920s.

Bajram CurriKukes

Related subjects

Industry

Energy in Albania

Electricity almost entirely from hydropower — which makes supply depend on rainfall.

Albanian Economy
Company

KESH

The state generator that runs the Drin cascade and supplies most Albanian electricity.

Tirane
River

The Drin

Albania's longest river and the backbone of its electricity system, dammed three times in the north.

Shkoder

Sources

The sections marked “deep dive” above were written for this Atlas from the source article named below, which was read in full (1,909 characters). They are AI-assisted research over that document, checked against the curated facts on this page. Verify anything consequential against a primary source.

  • WikipediaFierza Hydroelectric Power Station — English Wikipedia · retrieved 03 Sep 2026
    Used to ground the deep-research section and as a discovery aid; not relied on alone for contested claims.
  • WikidataWikidata item Q696290 · retrieved 03 Sep 2026
    Source of the population, area and elevation figures shown in Quick facts, each with its own observation year.
  • Open-Meteo / ECMWFMonthly climate normals, 1994–2023 · retrieved 03 Sep 2026
    Computed here from daily ERA5 reanalysis via Open-Meteo over 1994–2023.
  • Wikimedia CommonsPhotographs · retrieved 03 Sep 2026
    Each photograph carries its own creator, licence and file link beneath it. Only public-domain, CC0, CC BY and CC BY-SA files are published.

Something wrong on this page? Corrections are welcome and are checked against the source record. Tell us what is wrong and, if you can, where the right figure comes from.