Kukës
A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.
🧭 引导视图
初次了解阿尔巴尼亚?每个页面均以通俗易懂的说明开篇——即便是十岁的孩子也能读懂——随后再展开详细内容。
⚡ 专业视图
您已掌握基础知识。直接进入正题,简明解释默认隐藏。此为默认模式。
Kukës airport is in the north-east mountains near Kosovo. It was built years earlier but only started taking passenger flights in 2021. It mostly serves Albanians living abroad who come home in summer.
Kukës airport is in the north-east mountains near Kosovo. It was built years earlier but only started taking passenger flights in 2021. It mostly serves Albanians living abroad who come home in summer.
The site now occupied by Kukës International Airport Zayed lies 3.5 km south of the city of Kukës, in the village of Shtiqën. Its recorded aviation history begins on 20 April 1929, when it opened for the first time as a domestic airfield offering a scheduled air connection between Tirana and Kukës via Peshkopi.
The link operated for approximately fifteen years before the communist government removed its civil status and converted the facility into a military airfield. It remained outside civilian use for decades until the circumstances of the 1998–1999 Kosovo War created new pressure to reactivate it.
During the Kosovo War, the United Arab Emirates organised a humanitarian camp in Kukës to assist refugees fleeing Kosovo. As part of that relief effort, the UAE first developed the airfield to allow the supply of incoming aid to reach the area. Kukës at that time received the largest influx of Kosovo citizens of any location in Albania.
UAE representatives used this period to propose the development of a permanent civil airport as a gift to the region. The Albanian government accepted the proposal, and the General Directorate of Civil Aviation undertook joint feasibility studies with the investors. On 15 February 2001, the Council of Ministers approved a Memorandum of Understanding between the Government of the Republic of Albania and the Government of the United Arab Emirates for the construction of Kukës Airport.
Construction began on 10 May 2003 and was completed on 31 October 2005. The total investment was approximately USD 20 million, provided as a funding gift by the government of the United Arab Emirates. At the time, the project was expected to employ more than 200 people and to open touristic opportunities for the surrounding region.
On 7 June 2006, Kukës Airport came under the administration of the General Directorate of Civil Aviation. That body was subsequently renamed the Civil Aviation Authority after 2010.
In 2021, Prime Minister Edi Rama changed the airport's name to Kukës International Airport Zayed — Albanian: Aeroporti Ndërkombëtar i Kukësit Zayed — in honour of Sheikh Zayed bin Sultan Al Nahyan, whose government had sponsored the original investment. The IATA code is KFZ and the ICAO code is LAKU.
The formal opening ceremony took place on 18 April 2021. To mark the occasion, Air Albania Flight 9003 arrived from London Stansted Airport after a short stopover at Tirana International Airport Nënë Tereza; a stopover was necessary because the airport had not yet received approval for direct international flights at that point.
The first international commercial flight landed on 9 July 2021, when Helvetic Airways Flight 8174 arrived from Zurich Airport, making that the first scheduled international service the airport had received.
The airport is designed to handle small to medium-sized aircraft. Its apron provides parking for up to three aircraft simultaneously. The terminal is equipped with a stated annual capacity of up to 500,000 passengers.
The airport is intended to function as a low-cost facility and to serve as an alternative to Tirana International Airport Nënë Tereza, which is the country's principal international gateway.
Since opening, the airport has faced persistent difficulties in attracting and retaining airline operators, which has constrained its full operationalisation. A specific technical challenge relates to the landing corridor, which presents conditions described as affecting the regularity of flight operations. As of 4 June 2024, no regular passenger flights were operating to or from Kukës Airport.
On 30 December 2024, a new airline named Air Kosova was established with the stated aim of maintaining regular flight operations to and from the airport. Prime Minister Edi Rama described the initiative as a shared source of national pride, placing it alongside Air Albania in that framing.
三十年气候平均值,地点: Kukës International Airport, 由本 Atlas 依据 1994—2023 年 ERA5 逐日再分析数据计算得出。以上为长期平均值,并非预报;任何单一年份均可能存在较大偏差。
最热月份为 August (日最高气温均值 29°C), 最冷月份为 January (日最低气温均值 -1°C), 降水最多的月份为 December (120 mm). 年均降雨总量为 1,128 mm.
| 月份 | 最高气温 | 最低气温 | 降雨量 | 降雨天数 | 日照时长 |
|---|---|---|---|---|---|
| January | 6°C | -1°C | 107 mm | 12 | 6.5 h |
| February | 8°C | 0°C | 96 mm | 11 | 7.6 h |
| March | 11°C | 3°C | 103 mm | 13 | 9.0 h |
| April | 16°C | 7°C | 112 mm | 15 | 10.3 h |
| May | 22°C | 12°C | 110 mm | 15 | 11.6 h |
| June | 26°C | 17°C | 75 mm | 12 | 13.3 h |
| July | 29°C | 19°C | 61 mm | 9 | 13.4 h |
| August | 29°C | 20°C | 56 mm | 8 | 12.5 h |
| September | 24°C | 15°C | 85 mm | 10 | 10.2 h |
| October | 19°C | 10°C | 88 mm | 10 | 8.6 h |
| November | 13°C | 6°C | 114 mm | 11 | 6.8 h |
| December | 8°C | 1°C | 120 mm | 12 | 6.0 h |
数据来源: ERA5 reanalysis via Open-Meteo, 1994–2023 · "最高气温"与"最低气温"分别为日最高和日最低气温均值。"降雨天数"统计降水量不低于 1 毫米的天数。 获取 JSON 数据
以下均为本 Atlas 中真实存在的关联关系——与本地点邻近的地点,以及本条目实际所属的主题类别。本栏目不包含任何通用推荐内容。
A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.
A wide white riverbed under 2,500 m peaks; the eastern end of the Theth trek.
The road head for the Valbona valley, named after a guerrilla leader of the 1920s.
A town rebuilt above a reservoir in the 1970s, and the northern end of the Nation's Road.
One main airport, four ferry corridors, and four land borders that all behave differently.
上文标注"深度解析"的章节,系本 Atlas 依据以下来源文章全文阅读后撰写而成 (4,317 字符). 以上内容为基于该文献的 AI 辅助研究成果,并已与本页精选事实核对。如涉及重要事项,请务必核对原始来源。
本页内容有误? 欢迎提交更正意见,所有意见均会与原始记录核对。请告知错误所在,如能提供正确数据的出处,请一并注明。